Rule 12
Application To Be Submitted To Obtain A License For Production Of Electricity
- Any person or corporate body who is interested to produce electricity shall have to submit an application in triplicate stating the following particulars relating to the proposed electricity production project  to the Secretary through the Electricity Development Department in the format as prescribed in Schedule- 6:-
(a) Detail description of the project (including a map of the project-site,  source of electricity to be produced, estimated cost and time to complete  the project, name of partners in the project and types of their  association, full name and address of the person or corporate body and  its directors with whom the ownership of the project shall be vested at   last, should be clearly shown),
(b) If mineral fuel is to be used to produce the electricity, types of fuel,  method of its supply and its storage system should be shown and  agreement or letter of intention, if any and relating documents thereto  should be submitted,
(c) Analysis of feasibility (technical description together with the detail  map of the project and economic analysis, description of clients and  consumers, estimated quantity of electricity to be sold, if any  transmission or distribution system belonging to other person or  corporate body is to be used in supplying the electricity description of  the same),
(d) Mode of finance (estimated cost of the project, economic condition of he investors of the project, commitment of the financial institutions to  be involved directly in the project, and percentage of liability, share  capital and debt of the investors),
(e) Acquisition or utilization of house and land (landowners’ description  and total area of the public or private land to be required for the project  for utilization or acquisition temporarily or permanently),
(f) Environment Impact Assessment (measures to be taken to minimize the  adverse affect due project on environment, social and economic effect  of project on the said area, utilization of local labour, source and  materials, benefits to be taken by the local people after the completion
of the project, training to be provided for local people in relation to  construction, maintenance and operation, facilities to be required for  construction site, safety arrangements and effect on landowners due to  operation of the project, details of people to be evacuated and necessary
plan for their rehabilitation also should clearly be shown),
(g) Description regarding sale and purchase of electric power of the project  (agreement or letter of intension if any and related documents thereto  also should be enclosed).
(h) Description relating to produced electricity transmission line of the  project,
(i) Description relating to supply, transportation and storage of the fuel (if  there is any agreement or letter of intention and other documents relating to the same, the copy should be enclosed),
(j) Other necessary matters.